
What is Waiting waste
Waiting waste is waiting for anything (e.g. equipment, instructions, materials).
Lean Yellow Belt tools
You can use these Lean Yellow Belt tools to eliminate or reduce waiting Muda (waste):
- Kaizen (Continuous Improvement)
- Standardized Work
Lean Green Belt tools
You can use these Lean Green Belt tools to eliminate or reduce waiting Muda (waste):
- Just-In-Time (JIT)
- Kaizen task-force workshops (a.k.a. Kaizen Blitz or Kaizen Event)
- Short Interval Control (SIC)
- Single-Minute Exchange of Dies (SMED)
- Value Stream Map (VSM)
Lean Black Belt tools
You can use these Lean Black Belt tools to eliminate or reduce waiting Muda (waste):
- Heijunka (Level Scheduling)
- Total Productive Maintenance (TPM)
Lean tools are great. Results are better.
Take the next step with Procestimal — expert-designed modules that help you apply Lean with real-world impact.
Try it free for 30 days — no credit card, no pressure.
About the Author
Floris Lap is an IASSC-certified Lean Six Sigma Black Belt and founder of Procestimal. He empowers organizations to maximize value and reduce waste through practical Lean Six Sigma solutions—contributing to a more sustainable world where businesses thrive with minimal resources. Contact us
Last updated on: